Tag Archives: Home Improvenent

Japanese Beetles

We are being attacked.  When the weather gets hot, Japanese Beetles come out and eat roses, hollyhocks, buckthorn, linden trees, and grape leaves.  The poor roses hardly have a chance.  The new flowers are ragged by noon.  All that is left on some of the grape leaves are the veins.  The hollyhocks lose their flowers as well.   

Japanese Beetle

Japanese Beetle

It’s war!  They are relatively new arrivals here in our neighborhood.  They showed up last year and this year they are all over our plants.  The evil little beetles come out and eat during the hot weather, lay their eggs in the lawn, the grubs hatch and eat the grass roots.  Next spring, the grubs become beetles, and the horrible thing starts all over again.   

When they hit the peach and vineyard area around Palisade, the chemicals came out and the infestation was stopped.  They don’t talk about the harm done to beneficial insects.  We try to be organic, so the poisons are out.   

The first tactic we adopted is to go out with a small pitcher with some dish soap laden water, find the bugs, and flick the bugs into the water with a table knife.  It goes on all day.  The grape arbor is high, and I am banned from going up more than two steps on the ladder, so some escape.  I am not big on killing living beings, but here is an exception.

They are fairly round with an iridescent shell.  Ugly little beasts.  At the end of the day we have dozens floating in the water.  With a lot of research, mostly on University Extension Service websites, we discovered neem oil with a tiny amount of azadirachtin kills and repels the little beasts. 

As the grubs get active in the turf, we are going to introduce some nematodes that attack the grubs.  With luck, we won’t have those dead spots in the lawn.  The nematodes stay around, so one time for them.  

On my bug hunt one morning, I didn’t find one beetle.  The fortified neem oil is working.  After a couple of days they are back and it’s back to work. The neighbors won’t be killing the grubs, so we will have an annual battle.   

If you have Japanese Beetles, neem oil with azadirachtin works.  Straight neem oil works on lots of harmful insects, but not without some azadirachtin for our little buddies.  If you need neem oil and don’t have Japanese Beetles, we have a couple of bottles we will give you.  Good hunting!

Holiday Decorations

 

?????????? Carol and I have always been ambivalent about elaborate holiday decorations.  We have had natural trees, artificial trees (boo), and now a little painted plywood tree made by a former coworker.  Decorations go on the mantel; there are colorful magnetic ornaments on the refrigerator door, a Santa on the stand in the foyer, and a Menorah in the front window.

 

Holiday Lights

Holiday Lights

The big one is the 20 foot tall tree in front of the house.   A few years ago something inspired me to light the tree.  This entailed quite a project.  The tree is between the street and the sidewalk, so I had to tunnel under the sidewalk to install a two inch pipe for the electric cord.  We didn’t want a cord tripping people on the sidewalk.  I dug, I pounded, tried a water jet,and dug some more.

 

The pipe is in, is capped and doesn’t show most of the year.  After Thanksgiving I run a long extension cord from the tree, throughout the pipe, and up to the outlet on the side of the house. We decided to be old fashioned and use large colored bulbs rather than the mini lights popular today.  Seven strings of lights for that big tree.

 

Next comes the hard part, getting those lights up.  We have a big lighted star on top.  Several seasons of trying methods have come up with the solution of putting the star on a stick and bungeeing it to the trunk.  The problem is getting it up there without killing myself.  That tree is TALL.  I have wobbled on the top step of my eight foot stepladder, tried to place it with the long hooked pole I use for hanging the light strings, and prayed, while Carol is on the ground crying and wailing.

 

This year I drug out the 20 foot extension ladder after deciding my life was worth breaking a few branches on the tree.  It turns out there is a sturdy side branch in just the right place to support the ladder.  I firmly believe I have a guardian angel.  Without that angel I would be dead many times over.

 

Menorah and TreeWith the star up, is is just the matter of winding those strings of lights around the tree.  Carol holds the string, and I put a kink in my neck placing the wires around the tree.  The whole process took three hours this year, and I am still alive.  The timer lights the tree from 4:00 PM to about 10:30 PM.

 

More neighbors on our block have lights, and it is festive out there in the evening.

 

Happy Holidays!  Peace on Earth, Goodwill to All!

New Garage

New Garage

New Garage

Our new garage is finished.  The old one car garage was designed for a 1936 Ford.  We never parked a car there.  The new one is 22’ by 20’ and will just barely hold both cars.  There is also room for stuff.  It is YELLOW.

Solar panels will be on the garage roof, so it was built with rafters instead of trusses to give a better angle for the panels.  There is storage space in the rafter area for things we don’t use very often.  The fencing is up, and I spread five cubic yards of dirt in the low spot where our patio is going.

Workshop

Workshop

The next step is landscaping.  We hear that landscapers are hard to get, so we will see.  We hope to have the entire project finished this year.

What’s Happening

002

Going Up

It’s Friday the thirteenth.  The moon is full.  The sun is giving off huge solar flares.  Mercury is retrograde.

Maybe this explains our week.  Our refrigerator icemaker quit for the second time.  The oven went black and the door is locked from a cleaning cycle for the second time.  Parts for the oven are on order.  A driver forced Carol into the curb in the alley by the bank and a trim strip got torn off the side of her car.

I went to work at Four Mile this morning and the group that was scheduled to come with 110 kids went to History Colorado instead due to some mix-up.  One of the horses is lame.

I went to buy electrical conduit for our garage project, bought the wrong stuff, went back, and they didn’t have everything in stock so I had to go to another place.  I thought the electrician was going to install the conduit, but he is busy and then I forgot about it until the day before the City Inspector was due to come.  The conduit is in and inspected.  No more deep trench across the back yard.

The old garage door opener we saved won’t work, so we have to have a new one.  The muffler fell off the lawn mower.  It is LOUD.  In the process of setting the forms for the concrete, the sprinkling system piping got cut in two places.  I had to go to two places for parts for that.

On the positive side, the garage walls are up and the rafters are being built.  We will have lots of storage space above our cars-no space robbing trusses.  Ed, the contractor on the garage is a joy to work with.  His business is Colorado Craftsmen.

Carol’s neck and shoulder hurt.  My wrist hurts.  I am not sleeping as well as usual.  The last installment of Cosmos has come and gone (if you haven’t seen it, do so).

I am waiting on a letter from the VA about my disability since I won the appeal.  The DAV told me they usually take around 60 days.  It has now been 70 days.  Well, actually, I applied in March 2009, so it has been more than 70 days.

Enough complaining.  All things considered, life is good.  We are going to have a secure garage for our cars, we will have a nice patio, and lovely brick walks.  The garden is doing well,

Home Improvement 2014

Old Garage

Old Garage

We are adding a two car garage and solar electricity to our 1937 vintage house.  We thought it would be a fairly straightforward project, but it is not working out that way.  We had a brick one car garage, an ugly carport, and a parking pad, all on the alley.

Step one, I mangled the sprinkling system in an attempt to move it out of the way of the larger garage.  It cost $140.00 to get that fixed after a three week wait, then the concrete form setters drove their stakes through one of the lines.  Ed, our contractor and a great guy, replied to my email with “oops, sorry”.  Of course, I found the leak while watering the lawn and garden just before two big thunderstorms.

The main problem is delay.  We waited two weeks on the demolition contractor.  We saved 800 bricks from the garage for walks and a patio.  The demo contractor recycles bricks, so saving those bricks cost us $300.

We waited another week for tree removal, than another week to get the tree stumps ground.  After another wait, the concrete contractor showed up to start setting forms.  They had to chop out two stumps.  The first forms they set were too close to the alley.  They had to take them out anyway to bring in road base (50% gravel, 50% dirt).  That entire process took two more weeks.  Yesterday, they poured the concrete.  The evening rain was perfect, cooling the concrete as it cured.

All the delays are part of any construction project these days.  The recession of 2008 put a lot of construction people out of business.  Now the economy is back, but the companies are not.  Those in business are overbooked and having trouble getting skilled workers.  None of the subcontractors’ workers have English as their first language.  They are all good guys, hard-working and fun to be around.  I provided some cervezas as they finished the day.  One cause of the labor shortage is the oil boom in North Dakota.  Natives up there used to say that the climate kept the riff-raff out.  Lots of riff-raff up there now.  Lots of money as well.  People go where the work and good money are.

Ed is going to do the fencing, which is a good thing as I called three fence contractors and only one returned the call.  We called three solar contractors, got responses from all three, but one never submitted a bid.

New Garage Concrete

New Garage Concrete

The garage should go up starting next week.  Many decisions to make.  Doors, lighting, roofing color, whether to replace the roofing on the sunroom where more solar panels are going, what kind of gate latches, finding a hardscape contractor (I was going to do it myself, but decided I am too old) paint colors, on and on.

In addition, we added painting the north gable on the house to the project.  I got up there to scrape the old paint.  The trim on the bottom of the siding and the bottom board of the siding are rotten.  Another task and some more expense.

The next door neighbors are learning about home improvement as well.  They decided to replace the roof themselves.  Mom, dad, and kid brother came from Omaha last week to help.  five people, fairly skilled, worked Friday through Monday and didn’t finish.  Mom and kid brother had to go back to Omaha, wife went to work.  Dad and husband worked Tuesday, Dad on Wednesday.  Thursday morning Dad worked two hours and left for Omaha to deal with the water in the attic and basement from the big storm there.   The roof is about 95% finished.  They will finish this weekend and have a nice roof with new skylights.

A lot of this story is about things that are fairly normal for any project, but the delays are somewhat unusual.  We did the kitchen last year with little delay as it went along.  When it is finished, this year’s project will make our little nest more livable and more fun.  I don’t call the process itself much fun.